Delta Trail System

Location
Lathrop, CA
Client
Multiple Developers and Homebuilders
Project Responsibilities
MacKay and Somps has been involved with the Mossdale Specific plan since itís inception and was the lead engineer and planner throughout the entitlement and construction process. We prepared the trails master plan, design guidelines and the urban design concept that created the Delta trails system in Lathrop. In conjunction with the Landscape Architect, we prepared the construction documents and provided construction surveying.
Project Description
During the initial entitlements of the Mossdale Specific Plan, the City and developers wanted a continuous trail system adjacent to the levee that provided access to the San Joaquin River and amenities to the residents. The river park system includes a continuous multi-use trail, a dog park, picnic areas, play structures and turf areas that are accessible throughout the specific plan area.
Regulatory Agencies
Due to this projects proximity to the San Joaquin River levee system, it was necessary to permit through the local jurisdiction, the local reclamation district, the Department of Water Resources and the Regional Water Quality Control Board. The project was ultimately funded through a CFD which required specialized reporting, scheduling and cost management.
pause play

Blank